Kalamazoo River Webline
Kalamazoo River Webline
Home  Site Overview Cleanup Projects Supplemental Investigations Resources  FAQ   River Tour  Glossary

Site Overview

About the Kalamazoo River Superfund Site

The Kalamazoo River Superfund Site, formally designated as the Allied Paper, Inc./Portage Creek/Kalamazoo River Superfund Site, is located in Kalamazoo and Allegan Counties in southwestern Michigan. The area was designated a Superfund Site because of PCBs (polychlorinated biphenyls) in the river′s fish, sediment, and surface water.

Since the river was designated a Superfund Site in 1990, a number of different companies have worked together at various times to conduct investigation and cleanup work. Currently, Georgia-Pacific LLC and Weyerhaeuser are continuing work to address PCBs in various areas of the Site. To learn more about PCBs, visit the Background FAQ and the associated links under the resource menu.

The Site includes several former paper mill properties and associated disposal areas; 80-miles of the Kalamazoo River from Morrow Dam to Lake Michigan; and a three-mile reach of Portage Creek from Cork Street to where it joins with the Kalamazoo River.

The Site covers a large geographical area and is divided into several operable units, or OUs. Four of these OUs were used as disposal areas for the paper mills, and were established to allow investigation and cleanup work at these locations to proceed on a separate schedule from the Kalamazoo River work. Georgia-Pacific is currently planning a cleanup project at the Willow Boulevard/A-Site Operable Unit, and is working with MDNRE to complete response work at the King Highway Landfill Operable Unit. Weyerhaeuser is preparing for a cleanup project at the 12th Street Landfill Operable Unit, and the USEPA has assumed the responsibility for completing the Feasibility Study at the Allied Paper, Inc. Operable Unit. To learn more about these various OUs, read the FAQ on the Operable Units and visit the River Tour.

Under the terms of an agreement (referred to as an AOC) established in February 2007, USEPA divided the Kalamazoo River portion of the Site into seven distinct areas (take a photographic tour of the river). Plans call for the current phase of Supplemental Investigations to proceed sequentially from the most upstream (Area 1) to the most downstream (Area 7).

The photographs above depict sampling and investigation work in Area 1, the cleanup project at Plainwell, and some downstream areas that will be the subject of future investigations. Visit the Supplemental Investigations page for more on the work in Area 1, the Cleanup Projects page for more on the two cleanup efforts near Plainwell, and the River Tour for photographs of the entire 80-mile Site.

More details can be found at Resources—Timeline and Resources—Useful Links.


Have a question?

Kalamazoo.Questions@arcadis-us.com

For general project information, contact the Kalamazoo River Project Team at Kalamazoo.Questions@arcadis-us.com.

Kalamazoo.Plainwell@arcadis-us.com

If you have specific questions about the ongoing cleanup project in the former Plainwell Impoundment, contact us at Kalamazoo.Plainwell@arcadis-us.com.


All Rights Reserved 2010 — Georgia-Pacific LLC